Follow us :

The performance advantages of the Solar mounting system

time2012/05/10

The complete system vertically lighting is typically simple question, solar ground screw to shed that and new wiring circuit in the same place. It might be not expect you to inflict control over the light switch. Common complication is definitely the position of this light. Ceiling lights, from your the surface of a ladder, so considering tracking the best thing per trip together with you - be careful, once you've your.

1 De-activate the with the existing lighting in your house fuse box.

Solar mounting system couple of lamps ladder, climb up, you take your screwdriver. Take off the screws holding the lamp on the ceiling. Lower the enough untwisting on the phone cap, disconnect the wires behind it. Pull light. You should leave an open electrical boxes, three exposed end from the line: black, white and bare.

3Searching for new lamp mounting bracket, by using its screw, in addition to their ladder. Electrical box mounting bracket with screws.

4Green grounding screw upon the mounting bracket on the bare copper ground wire connection. The grounding screw is tightened.

5 brought the lighting fixtures and electrical boxes held towards the ladder. Line cap, white line white line for the fixture inside the electrical box connection. Carry out the same two black lines.

6 Lift the lighting electrical boxes, push restricted area two-wire connection. Fixture mounting bracket with the screw.

7Turn power on the fuse box ground screw.